Sorting Grouped Assets in Task Page by due date (from last pipeline step)

Hi there,

I’m currently doing a schedule for four departments and I want to use the task+Gantt page. (I’m already in Design Mode and Canvas)

I’ve already been able to make a filter to show the assets which include at least one artist which is working on it.

What I want to do now is sort my grouped assets by the due date of the last pipeline step. Currently it is sorting the grouped assets in alphabetical order and It’ll only sort due dates within each asset by pipeline step. I want it for the whole asset.

Is this possible and how?

1 Like