Hi @Ricardo_Musch! I do agree with you, I think what you’re describing is very typical - artists might double up on tasks, have down time while they wait on reviews or changes from upstream, etc all of which would mean that it isn’t actually the case that “a task with a duration of X requiring Y artist means that task uses 100% of that artist’s time from start to finish.”

We took an intentionally simplistic route with our Flow Production Tracking integration so that we could more quickly get something into people’s hands and hear what people think is missing. We could definitely consider making this more configurable so that you could do something like specify exactly which field is utilized by Flow Generative Scheduling (e.g. something besides duration.)

There was a suggestion in another post (Durations vs Workloads) to potentially leverage Workload for this as well, do you think that would be helpful?